INTERNALLY DEVELOPED TOOLS
SEIDR: Tailoring simulations to address project-specific
challenges with deterministic and probabilistic schedules.
Overlooking weather impacts can lead to delays, contract
disputes, and long-term risks.
Utilizing our experience and know-how, SEIDR addresses
these challenges by incorporating historical weather data
along with data from meteorological measuring stations in
the project area to optimize scheduling.
SEIDR simulates real-world conditions to improve project
planning and decision-making, ensuring smooth operations,
reducing delays, and mitigating risks.
SEIDR was recently validated by modeling a 5-month foundation installation campaign, which was then accurately mirrored in real time, with only a 2-day variance from the model.
By using both deterministic and probabilistic schedules,
Explore how SEIDR optimises offshore projects
POWERHUB: Providing a better interface and change management to mitigate the risks of costly reworks and delays
Offshore wind projects are becoming increasingly complex
with more interfaces and team members. Yet, legacy tools
still manage these changes, causing misaligned interfaces,
lost audit trails, and misinformed decision-making.
With PowerHub, we address these issues by consolidating
project data, 昀椀xing information gaps, and aligning interfac-
es. With 3D visualizations and real-time asset models, the
tool provides a uni昀椀ed, comprehensive asset view which
automatically detects and highlights any misalignments.
The result: improved e昀케ciency, cost savings, and smoother project execution.